Central Kowloon Route - Yau Ma Tei East

Night Works for Gascoigne Road Flyover Noise Enclosures Installation Works

The construction of Gascoigne Road Flyover noise enclosures is one of the major works under the Central Kowloon Route – Yau Ma Tei East Contract. The works comprise the construction of an approximately 550m long noise enclosure at a section of Gascoigne Road Flyover from Yaumati Catholic Primary School to Nathan Road. During the construction, sections of the Gascoigne Road Flyover and Ferry Street will be utilized to facilitate the installation works.

Night Works

The noise enclosures installation works have to be carried out at night. The Contractor will employ the quietest practicable working methods, including adopting appropriate noise mitigation measures and low-noise equipment. The workers will also be reminded to keep their communication to the lowest possible volume to minimize the impact on nearby residents.

Optimise Construction with Innovative Technology

With the help of Building Information Modeling (BIM), Design for Manufacture and Assembly (DfMA) was adopted and thus the majority of the fabrication and assembling works could be done in the day time in order to minimize the night time site work. The BIM also facilitates the construction planning and improves the work efficiency.

Temporary Traffic Arrangements

As the Gascoigne Road Flyover is a major route in Kowloon, to minimize the impact on traffic, the noise enclosures installation works have to be carried out at night. During the night works, relevant sections of the Gascoigne Road Flyover and Ferry Street will be temporarily closed and corresponding temporary traffic arrangements will be implemented according to the installation location. Please refer to Temporary Traffic Arrangements 1, 2 and 3 below.

To minimize inconvenience caused to the drivers, the Contractor will avoid frequently changing the temporary traffic arrangements when planning daily installation works. Appropriate traffic signs will also be placed at concerned locations to guide the drivers.

During the implementation of temporary traffic arrangements, drivers should follow on-site temporary traffic signs to their destinations accordingly. For details of the temporary traffic arrangements and diversion routes, please refer to the Central Kowloon Route traffic notice and Transport Department notice.

Implementation date

From May 2022

Implementation period

Scheduled from 0a.m. to 6a.m. daily tentatively*

*The Contractor will keep optimizing the construction time and sequence of the installation works according to the on-site situation (such as traffic impact), to improve the efficiency and shorten the overall construction period.

Temporary Traffic Arrangements 1:
Full Closure of Gascoigne Road Flyover Northbound and Southbound
Temporary closure areas
2Ferry Street southbound from Waterloo Road towards Gascoigne Road Flyover Slip Road
4Gascoigne Road Flyover southbound from Shantung Street to Wylie Road
5Gascoigne Road Flyover northbound from Wylie Road to Waterloo Road
7 Gascoigne Road Flyover northbound from Wylie Road towards Waterloo Road
Temporary Traffic Arrangements 2:
Full Closure of Gascoigne Road Flyover Northbound and Ferry Street Northbound
Temporary closure areas
5Gascoigne Road Flyover northbound from Wylie Road to Waterloo Road
6 Ferry Street northbound from Yan Cheung Road to Waterloo Road
7Gascoigne Road Flyover northbound from Wylie Road towards Waterloo Road
8Ferry Street northbound from Yan Cheung Road towards Gascoigne Road Flyover
Temporary Traffic Arrangements 3:
Full Closure of Gascoigne Road Flyover and Ferry Street Northbound and Southbound
Temporary closure areas
2Ferry Street southbound from Waterloo Road towards Gascoigne Road Flyover Slip Road
3Gascoigne Road Flyover southbound from Bute Street towards Ferry Street
4Gascoigne Road Flyover southbound from Bute Street to Wylie Road
5Gascoigne Road Flyover northbound from Wylie Road to Waterloo Road
7Gascoigne Road Flyover northbound from Wylie Road towards Waterloo Road
Re-routed Public Transport

The following public bus routes will be adjusted to facilitate the temporary traffic arrangement. Passengers should pay attention to the notices posted by public transport service operators for more details.

KMB

N368

Location of bus stops will not be affected
Contact Us

Should you have any enquiries, please contact us at:

Email
enquiry@ckr-hyd.hk
Night works on-site engineer hotline (10p.m.to 6 a.m.)
9636 3793
24-hour hotline
9129 2027

Relevant information about the temporary traffic diversion arrangement will be issued to the public through different channels, such as Central Kowloon Route project website, as well as Transport Department’s website etc.